Merge branch refs/heads/1.12.x into 2.1.x #20883
tests.yml
on: push
Determine levels tests matrix
38s
Matrix: Integration tests
Matrix: Tests
Matrix: Levels tests
Annotations
24 errors
Tests (8.0, windows-latest)
The job running on runner GitHub Actions 46 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.0, windows-latest)
The operation was canceled.
|
Tests (8.1, windows-latest)
The job running on runner GitHub Actions 451 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.1, windows-latest)
The operation was canceled.
|
Tests (8.4, windows-latest)
The job running on runner GitHub Actions 285 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.4, windows-latest)
The operation was canceled.
|
Tests (7.4, windows-latest)
The job running on runner GitHub Actions 448 has exceeded the maximum execution time of 60 minutes.
|
Tests (7.4, windows-latest)
The operation was canceled.
|
Tests (8.0, ubuntu-latest)
The job running on runner GitHub Actions 433 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.0, ubuntu-latest)
The operation was canceled.
|
Tests (8.1, ubuntu-latest)
The job running on runner GitHub Actions 276 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.1, ubuntu-latest)
The operation was canceled.
|
Tests (7.4, ubuntu-latest)
The job running on runner GitHub Actions 36 has exceeded the maximum execution time of 60 minutes.
|
Tests (7.4, ubuntu-latest)
The operation was canceled.
|
Tests (8.3, ubuntu-latest)
The job running on runner GitHub Actions 211 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.3, ubuntu-latest)
The operation was canceled.
|
Tests (8.3, windows-latest)
The job running on runner GitHub Actions 182 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.3, windows-latest)
The operation was canceled.
|
Tests (8.4, ubuntu-latest)
The job running on runner GitHub Actions 222 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.4, ubuntu-latest)
The operation was canceled.
|
Tests (8.2, ubuntu-latest)
The job running on runner GitHub Actions 160 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.2, ubuntu-latest)
The operation was canceled.
|
Tests (8.2, windows-latest)
The job running on runner GitHub Actions 288 has exceeded the maximum execution time of 60 minutes.
|
Tests (8.2, windows-latest)
The operation was canceled.
|