Skip to content

Bump com.diffplug.spotless:spotless-maven-plugin from 2.46.1 to 3.0.0 #1980

Bump com.diffplug.spotless:spotless-maven-plugin from 2.46.1 to 3.0.0

Bump com.diffplug.spotless:spotless-maven-plugin from 2.46.1 to 3.0.0 #1980

Status Cancelled
Total duration 6h 0m 20s
Artifacts

test-rabbitmq-alphas.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Test against pivotalrabbitmq/rabbitmq:main-otp27
The operation was canceled.
Test against pivotalrabbitmq/rabbitmq:main-otp27
The job has exceeded the maximum execution time of 6h0m0s
Test against pivotalrabbitmq/rabbitmq:v4.1.x-otp27
The operation was canceled.
Test against pivotalrabbitmq/rabbitmq:v4.1.x-otp27
The job has exceeded the maximum execution time of 6h0m0s