Skip to content

Introduce a 'tailwindcss:upgrade' task #137

Introduce a 'tailwindcss:upgrade' task

Introduce a 'tailwindcss:upgrade' task #137

Triggered via pull request January 23, 2025 17:47
Status Cancelled
Total duration 2m 6s
Artifacts

upstream.yml

on: pull_request
Matrix: tests (rails main)
Matrix: user-install
Matrix: user-upgrade
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 4 warnings
user-upgrade (rails main)
Process completed with exit code 127.
user-upgrade (rails 7-2-stable)
Process completed with exit code 127.
user-upgrade (rails 8-0-stable)
Process completed with exit code 127.
tests (rails main) (3.3)
Process completed with exit code 1.
user-install (rails 7-2-stable)
Canceling since a higher priority waiting request for 'upstream-refs/pull/466/merge' exists
user-install (rails 7-2-stable)
The operation was canceled.
user-install (rails main)
Canceling since a higher priority waiting request for 'upstream-refs/pull/466/merge' exists
user-install (rails main)
The operation was canceled.
user-install (rails 8-0-stable)
Canceling since a higher priority waiting request for 'upstream-refs/pull/466/merge' exists
user-install (rails 8-0-stable)
The operation was canceled.
user-upgrade (rails main)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
user-upgrade (rails 7-2-stable)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
user-upgrade (rails 8-0-stable)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
tests (rails main) (3.3)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636