Skip to content

add accept_confirm if turbo is available so system tests don't fail. fixes #519 #218

add accept_confirm if turbo is available so system tests don't fail. fixes #519

add accept_confirm if turbo is available so system tests don't fail. fixes #519 #218

Triggered via pull request March 19, 2025 19:13
Status Cancelled
Total duration 1m 42s
Artifacts

upstream.yml

on: pull_request
Matrix: tests (rails main)
Matrix: user-install
Matrix: user-upgrade
Fit to window
Zoom out
Zoom in

Annotations

12 errors
user-upgrade (rails main)
Canceling since a higher priority waiting request for 'upstream-refs/pull/520/merge' exists
user-upgrade (rails main)
The operation was canceled.
user-install (rails main)
Canceling since a higher priority waiting request for 'upstream-refs/pull/520/merge' exists
user-install (rails main)
The operation was canceled.
user-install (rails 8-0-stable)
Canceling since a higher priority waiting request for 'upstream-refs/pull/520/merge' exists
user-install (rails 8-0-stable)
The operation was canceled.
user-upgrade (rails 8-0-stable)
Canceling since a higher priority waiting request for 'upstream-refs/pull/520/merge' exists
user-upgrade (rails 8-0-stable)
The operation was canceled.
user-install (rails 7-2-stable)
Canceling since a higher priority waiting request for 'upstream-refs/pull/520/merge' exists
user-install (rails 7-2-stable)
The operation was canceled.
user-upgrade (rails 7-2-stable)
Canceling since a higher priority waiting request for 'upstream-refs/pull/520/merge' exists
user-upgrade (rails 7-2-stable)
The operation was canceled.