Update README.md to add context around Tailwind 4 and PostCSS #335
Triggered via pull request
October 27, 2025 20:22
Status
Cancelled
Total duration
1m 26s
Artifacts
–
upstream.yml
on: pull_request
Matrix: tests (rails main)
Matrix: user-install
Matrix: user-upgrade
Annotations
15 errors
|
user-upgrade (rails 7-2-stable)
Canceling since a higher priority waiting request for upstream-refs/pull/576/merge exists
|
|
user-upgrade (rails 7-2-stable)
The operation was canceled.
|
|
user-upgrade (rails 8-0-stable)
Canceling since a higher priority waiting request for upstream-refs/pull/576/merge exists
|
|
user-upgrade (rails 8-0-stable)
The operation was canceled.
|
|
user-install (rails 7-2-stable)
Canceling since a higher priority waiting request for upstream-refs/pull/576/merge exists
|
|
user-install (rails 7-2-stable)
The operation was canceled.
|
|
user-install (rails 8-0-stable)
Canceling since a higher priority waiting request for upstream-refs/pull/576/merge exists
|
|
user-install (rails 8-0-stable)
The operation was canceled.
|
|
user-upgrade (rails main)
Canceling since a higher priority waiting request for upstream-refs/pull/576/merge exists
|
|
user-upgrade (rails main)
The operation was canceled.
|
|
user-install (rails main)
Canceling since a higher priority waiting request for upstream-refs/pull/576/merge exists
|
|
user-install (rails main)
The operation was canceled.
|
|
user-install (rails 8-1-stable)
Canceling since a higher priority waiting request for upstream-refs/pull/576/merge exists
|
|
user-install (rails 8-1-stable)
The operation was canceled.
|
|
upstream
Canceling since a higher priority waiting request for upstream-refs/pull/576/merge exists
|