Fix: PSS label reset issue #821
Merged
Red Hat Konflux / Red Hat Konflux / openshift-gitops-operator-enterprise-contract / gitops-operator
succeeded
Jan 16, 2025 in 3m 52s
Succeeded
Integration test for snapshot openshift-gitops-operator-hznqq and scenario openshift-gitops-operator-enterprise-contract has passed
Details
- Pipelinerun: openshift-gitops-operator-enterprise-contract-xk66x
| Task | Duration | Test Suite | Status | Details |
|---|---|---|---|---|
| verify | 3m51s | ✔️ SUCCESS | ✔️ 360 success(es) |
Loading