Skip to content

Catalog update [scaleops-operator] [v4.12,v4.13,v4.14,v4.15,v4.16,v4.17,v4.18,v4.19,v4.20]#7579

Closed
rh-operator-bundle-bot wants to merge 1 commit intomainfrom
add-scaleops-operator-v1.27.0-to-fbc-24177
Closed

Catalog update [scaleops-operator] [v4.12,v4.13,v4.14,v4.15,v4.16,v4.17,v4.18,v4.19,v4.20]#7579
rh-operator-bundle-bot wants to merge 1 commit intomainfrom
add-scaleops-operator-v1.27.0-to-fbc-24177

Conversation

@rh-operator-bundle-bot
Copy link
Collaborator

🚀 Automated PR: FBC Release Process

This pull request was automatically generated as part of the FBC release process.

  • Operator: scaleops-operator
  • Version: v1.27.0
  • Image: registry.connect.redhat.com/scaleops-sh/scaleops-operator-bundle@sha256:72aea42b96c0ef5d66e98b23067c4733be6aee06c703d54fdf4c4e3df65464c1

For reference, see the previous PR.

If you have any questions or need modifications, please let us know!

Signed-off-by: rh-operator-bundle-bot <exd-guild-isv+operators@redhat.com>
@rh-operator-bundle-bot rh-operator-bundle-bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Feb 1, 2026
@rh-operator-bundle-bot rh-operator-bundle-bot changed the title Auto FBC release scaleops-operator v1.27.0 Catalog update [scaleops-operator] [v4.12,v4.13,v4.14,v4.15,v4.16,v4.17,v4.18,v4.19,v4.20] Feb 1, 2026
@rh-operator-bundle-bot
Copy link
Collaborator Author

There were some errors while publishing your Operator Bundle. You can use this support case to contact the Red Hat certification team for review.

@rh-operator-bundle-bot
Copy link
Collaborator Author

@rh-operator-bundle-bot
Copy link
Collaborator Author

Pipeline Summary

Pipeline: operator-hosted-pipeline
PipelineRun: operator-hosted-pipeline-run4wtpc
Start Time: 2026-02-01 19:16:00+00:00

Tasks

Status Task Start Time Duration
✔️ get-pr-number 2026-02-01 19:16:00+00:00 7 seconds
✔️ acquire-lease 2026-02-01 19:16:12+00:00 5 seconds
✔️ set-github-status-pending 2026-02-01 19:16:20+00:00 7 seconds
✔️ set-github-started-label 2026-02-01 19:16:20+00:00 8 seconds
✔️ set-env 2026-02-01 19:16:32+00:00 7 seconds
✔️ clone-repository-base 2026-02-01 19:16:47+00:00 a minute
✔️ clone-repository 2026-02-01 19:16:48+00:00 a minute
✔️ detect-changes 2026-02-01 19:18:02+00:00 36 seconds
✔️ check-permissions 2026-02-01 19:18:47+00:00 39 seconds
✔️ set-github-pr-title 2026-02-01 19:19:35+00:00 7 seconds
✔️ read-config 2026-02-01 19:19:46+00:00 35 seconds
✔️ resolve-pr-type 2026-02-01 19:20:25+00:00 6 seconds
✔️ validate-catalog-format 2026-02-01 19:20:34+00:00 a minute
✔️ build-fragment-images 2026-02-01 19:22:13+00:00 a minute
✔️ content-hash 2026-02-01 19:23:43+00:00 33 seconds
✔️ certification-project-check 2026-02-01 19:24:22+00:00 36 seconds
✔️ get-organization 2026-02-01 19:25:00+00:00 38 seconds
✔️ get-pyxis-certification-data 2026-02-01 19:25:41+00:00 39 seconds
✔️ verify-project 2026-02-01 19:26:22+00:00 6 seconds
✔️ update-cert-project-status 2026-02-01 19:26:30+00:00 5 seconds
✔️ static-tests 2026-02-01 19:26:38+00:00 40 seconds
✔️ merge-registry-credentials 2026-02-01 19:27:19+00:00 20 seconds
✔️ digest-pinning 2026-02-01 19:27:42+00:00 42 seconds
✔️ verify-pinned-digest 2026-02-01 19:28:26+00:00 8 seconds
✔️ dockerfile-creation 2026-02-01 19:28:35+00:00 40 seconds
✔️ build-bundle 2026-02-01 19:29:16+00:00 44 seconds
✔️ get-supported-versions 2026-02-01 19:30:01+00:00 47 seconds
✔️ build-fbc-index-images 2026-02-01 19:30:49+00:00 29 minutes
✔️ get-ci-results-attempt 2026-02-01 20:00:15+00:00 17 seconds
✔️ preflight-trigger 2026-02-01 20:00:33+00:00 24 seconds
✔️ get-ci-results 2026-02-01 20:00:58+00:00 16 seconds
✔️ link-pull-request-with-open-status 2026-02-01 20:01:15+00:00 6 seconds
merge-pr 2026-02-01 20:01:22+00:00 38 seconds

Pipeline logs: https://gist.github.com/rh-operator-bundle-bot/d07d63f9c2625ce937d115be163eecbb

❌ Not merged

PR cannot be merged for the following reasons: ``

Troubleshooting

Please refer to the troubleshooting guide.

Run /pipeline restart operator-hosted-pipeline in case of pipeline failure to restart a pipeline.

@openshift-merge-robot openshift-merge-robot added the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Feb 8, 2026
@openshift-merge-robot
Copy link

PR needs rebase.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@github-actions
Copy link
Contributor

This pull request is stale because it has been open for 30 days with no activity.

@github-actions github-actions bot added the lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. label Mar 11, 2026
@github-actions
Copy link
Contributor

This pull request was closed because it has been inactive for 7 days since being marked as stale.

@github-actions github-actions bot closed this Mar 18, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. operator-hosted-pipeline/failed

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants