Skip to content

Conversation

@djnakabaale
Copy link
Contributor

Thanks for submitting your Operator. Please check the below list before you create your Pull Request.

New Submissions

Your submission should not

  • Add more than one operator bundle per PR
  • Modify any operator
  • Rename an operator
  • Modify any files outside the above-mentioned folders
  • Contain more than one commit. Please squash your commits.

Operator Description must contain (in order)

  1. Description of the managed Application and where to find more information
  2. Features and capabilities of your Operator and how to use it
  3. Any manual steps about potential pre-requisites for using your Operator

Operator Metadata should contain

  • Human-readable name and 1-liner description about your Operator
  • Valid category name 1
  • One of the pre-defined capability levels2
  • Links to the maintainer, source code and documentation
  • Example templates for all Custom Resource Definitions intended to be used
  • A quadratic logo

Remember that you can preview your CSV here.

--

1 If you feel your Operator does not fit any of the pre-defined categories, file an issue against this repo and explain your need

2 For more information see here

@openshift-ci openshift-ci bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Oct 29, 2025
@rh-operator-bundle-bot rh-operator-bundle-bot added operator-hosted-pipeline/started approved Indicates a PR has been approved by an approver from all required OWNERS files. labels Oct 29, 2025
@rh-operator-bundle-bot
Copy link
Contributor

Static test results

Status Check Message
⚠️ check_osdk_bundle_validate_operatorhub Warning: Value : The "operatorhub" validator is deprecated; for equivalent validation use "operatorhub/v2", "standardcapabilities" and "standardcategories" validators

@rh-operator-bundle-bot
Copy link
Contributor

@rh-operator-bundle-bot
Copy link
Contributor

Pipeline Summary

Pipeline: operator-hosted-pipeline
PipelineRun: operator-hosted-pipeline-rundq8rp
Start Time: 2025-10-29 17:39:21+00:00

Tasks

Status Task Start Time Duration
✔️ get-pr-number 2025-10-29 17:39:27+00:00 6 seconds
✔️ acquire-lease 2025-10-29 17:39:40+00:00 4 seconds
✔️ set-github-started-label 2025-10-29 17:39:50+00:00 8 seconds
✔️ set-github-status-pending 2025-10-29 17:39:50+00:00 7 seconds
✔️ set-env 2025-10-29 17:40:08+00:00 6 seconds
✔️ clone-repository-base 2025-10-29 17:40:19+00:00 58 seconds
✔️ clone-repository 2025-10-29 17:40:19+00:00 a minute
✔️ detect-changes 2025-10-29 17:41:34+00:00 51 seconds
✔️ yaml-lint 2025-10-29 17:42:33+00:00 46 seconds
✔️ check-permissions 2025-10-29 17:43:25+00:00 46 seconds
✔️ set-github-pr-title 2025-10-29 17:44:16+00:00 8 seconds
✔️ read-config 2025-10-29 17:44:26+00:00 43 seconds
✔️ resolve-pr-type 2025-10-29 17:45:11+00:00 6 seconds
✔️ apply-test-waivers 2025-10-29 17:45:20+00:00 42 seconds
✔️ content-hash 2025-10-29 17:46:04+00:00 45 seconds
✔️ certification-project-check 2025-10-29 17:46:54+00:00 48 seconds
✔️ get-organization 2025-10-29 17:47:49+00:00 45 seconds
✔️ get-pyxis-certification-data 2025-10-29 17:48:37+00:00 56 seconds
✔️ static-tests 2025-10-29 17:49:36+00:00 48 seconds
✔️ merge-registry-credentials 2025-10-29 17:50:25+00:00 18 seconds
✔️ digest-pinning 2025-10-29 17:50:46+00:00 47 seconds
✔️ verify-pinned-digest 2025-10-29 17:51:36+00:00 6 seconds
✔️ dockerfile-creation 2025-10-29 17:51:44+00:00 42 seconds
✔️ build-bundle 2025-10-29 17:52:28+00:00 58 seconds
✔️ make-bundle-repo-public 2025-10-29 17:53:32+00:00 6 seconds
✔️ get-supported-versions 2025-10-29 17:53:41+00:00 47 seconds
✔️ build-fbc-scratch-catalog 2025-10-29 17:54:32+00:00 a minute
✔️ make-index-repo-public 2025-10-29 17:55:39+00:00 5 seconds
✔️ get-ci-results-attempt 2025-10-29 17:55:47+00:00 15 seconds
✔️ preflight-trigger 2025-10-29 17:56:05+00:00 23 minutes
✔️ evaluate-preflight-result 2025-10-29 18:19:11+00:00 44 seconds
✔️ get-ci-results 2025-10-29 18:19:56+00:00 27 seconds
✔️ link-pull-request-with-open-status 2025-10-29 18:20:23+00:00 6 seconds
✔️ add-bundle-to-fbc-dryrun 2025-10-29 18:20:30+00:00 2 minutes
✔️ merge-pr 2025-10-29 18:23:07+00:00 49 seconds

Pipeline logs: https://gist.github.com/rh-operator-bundle-bot/134022234238891dfd839238b861539b

❌ Not merged

PR cannot be merged for the following reasons: Pull Request is still a draft (mergePullRequest)

Troubleshooting

Please refer to the troubleshooting guide.

Run /pipeline restart operator-hosted-pipeline in case of pipeline failure to restart a pipeline.

@djnakabaale djnakabaale marked this pull request as ready for review October 30, 2025 15:57
@openshift-ci openshift-ci bot removed the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Oct 30, 2025
@djnakabaale djnakabaale force-pushed the koku-metrics-operator-v4.3.0-release branch from 7bb248c to 2d76772 Compare October 30, 2025 15:58
@djnakabaale
Copy link
Contributor Author

/pipeline restart operator-hosted-pipeline

@rh-operator-bundle-bot
Copy link
Contributor

Static test results

Status Check Message
⚠️ check_osdk_bundle_validate_operatorhub Warning: Value : The "operatorhub" validator is deprecated; for equivalent validation use "operatorhub/v2", "standardcapabilities" and "standardcategories" validators

@rh-operator-bundle-bot
Copy link
Contributor

@rh-operator-bundle-bot
Copy link
Contributor

Pipeline Summary

Pipeline: operator-hosted-pipeline
PipelineRun: operator-hosted-pipeline-runwg2zm
Start Time: 2025-10-30 15:59:00+00:00

Tasks

Status Task Start Time Duration
✔️ get-pr-number 2025-10-30 15:59:06+00:00 5 seconds
acquire-lease 2025-10-30 15:59:18+00:00 35 minutes

Pipeline logs: https://gist.github.com/rh-operator-bundle-bot/caf1ff81bd765852c80a514d1b2af6fe

Troubleshooting

Please refer to the troubleshooting guide.

Run /pipeline restart operator-hosted-pipeline in case of pipeline failure to restart a pipeline.

@rh-operator-bundle-bot
Copy link
Contributor

Pipeline Summary

Pipeline: operator-hosted-pipeline
PipelineRun: operator-hosted-pipeline-runqcxks
Start Time: 2025-10-30 15:57:07+00:00

Tasks

Status Task Start Time Duration
✔️ get-pr-number 2025-10-30 15:57:08+00:00 5 seconds
✔️ acquire-lease 2025-10-30 15:57:17+00:00 5 seconds
✔️ set-github-started-label 2025-10-30 15:57:26+00:00 8 seconds
✔️ set-github-status-pending 2025-10-30 15:57:26+00:00 7 seconds
✔️ set-env 2025-10-30 15:57:37+00:00 7 seconds
✔️ clone-repository-base 2025-10-30 15:57:48+00:00 a minute
✔️ clone-repository 2025-10-30 15:57:48+00:00 a minute
✔️ detect-changes 2025-10-30 15:59:25+00:00 48 seconds
✔️ yaml-lint 2025-10-30 16:00:20+00:00 50 seconds
✔️ check-permissions 2025-10-30 16:01:17+00:00 47 seconds
✔️ set-github-pr-title 2025-10-30 16:02:13+00:00 6 seconds
✔️ read-config 2025-10-30 16:02:27+00:00 45 seconds
✔️ resolve-pr-type 2025-10-30 16:03:22+00:00 6 seconds
✔️ apply-test-waivers 2025-10-30 16:03:36+00:00 50 seconds
✔️ content-hash 2025-10-30 16:04:33+00:00 42 seconds
✔️ certification-project-check 2025-10-30 16:05:20+00:00 44 seconds
✔️ get-organization 2025-10-30 16:06:09+00:00 48 seconds
✔️ get-pyxis-certification-data 2025-10-30 16:06:59+00:00 52 seconds
✔️ static-tests 2025-10-30 16:07:52+00:00 19 seconds
✔️ merge-registry-credentials 2025-10-30 16:08:19+00:00 19 seconds
✔️ digest-pinning 2025-10-30 16:08:42+00:00 52 seconds
✔️ verify-pinned-digest 2025-10-30 16:09:36+00:00 5 seconds
✔️ dockerfile-creation 2025-10-30 16:09:46+00:00 49 seconds
✔️ build-bundle 2025-10-30 16:10:37+00:00 56 seconds
✔️ make-bundle-repo-public 2025-10-30 16:11:36+00:00 6 seconds
✔️ get-supported-versions 2025-10-30 16:11:44+00:00 55 seconds
✔️ build-fbc-scratch-catalog 2025-10-30 16:12:41+00:00 58 seconds
✔️ make-index-repo-public 2025-10-30 16:13:42+00:00 6 seconds
✔️ get-ci-results-attempt 2025-10-30 16:13:51+00:00 13 seconds
✔️ preflight-trigger 2025-10-30 16:14:09+00:00 18 minutes
✔️ evaluate-preflight-result 2025-10-30 16:32:28+00:00 45 seconds
✔️ get-ci-results 2025-10-30 16:33:14+00:00 23 seconds
✔️ link-pull-request-with-open-status 2025-10-30 16:33:37+00:00 5 seconds
✔️ add-bundle-to-fbc-dryrun 2025-10-30 16:33:43+00:00 2 minutes
✔️ merge-pr 2025-10-30 16:36:33+00:00 15 seconds

Pipeline logs: https://gist.github.com/rh-operator-bundle-bot/0fec45f4a2188f2149e3b81ca97f5b75

❌ Not merged

PR cannot be merged for the following reasons: Another pipeline is already in progress: please wait for the result of the new tests.

Troubleshooting

Please refer to the troubleshooting guide.

Run /pipeline restart operator-hosted-pipeline in case of pipeline failure to restart a pipeline.

@djnakabaale
Copy link
Contributor Author

/pipeline restart operator-hosted-pipeline

1 similar comment
@djnakabaale
Copy link
Contributor Author

/pipeline restart operator-hosted-pipeline

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. operator-hosted-pipeline/passed

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants