Replace old "master" references with "main" #386
Merged
Red Hat Konflux / Red Hat Konflux / sync2jira-on-pull-request
succeeded
Oct 24, 2025 in 5m 0s
Success
Red Hat Konflux/sync2jira-on-pull-request has successfully validated your commit.
Details
- Namespace: sync2jira-tenant
- PipelineRun: sync2jira-on-pull-request-xg7g2
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🟢 Succeeded | 6 seconds | |
| 🟢 Succeeded | 8 seconds | |
| 🟢 Succeeded | 7 seconds | |
| 🟢 Succeeded | 3 minutes | |
| 🟢 Succeeded | 5 seconds | |
| 🟢 Succeeded | 8 seconds | |
| 🟢 Succeeded | 10 seconds | |
| 🟢 Succeeded | 11 seconds | |
| 🟢 Succeeded | 47 seconds | |
| 🟢 Succeeded | 58 seconds | |
| 🟢 Succeeded | 27 seconds | |
| 🟢 Succeeded | 7 seconds | |
| 🟢 Succeeded | 13 seconds | |
| 🟢 Succeeded | 16 seconds | |
| 🟢 Succeeded | 6 seconds | |
| 🟢 Succeeded | 6 seconds |
Loading