Skip to content

chore(deps): update module github.com/moby/term to v0.5.2

ce3d98f
Select commit
Loading
Failed to load commit list.
Open

chore(deps): update module github.com/moby/term to v0.5.2 #308

chore(deps): update module github.com/moby/term to v0.5.2
ce3d98f
Select commit
Loading
Failed to load commit list.
Red Hat Konflux / Red Hat Konflux / operator-enterprise-contract-1-6 / controller-rhel9-operator-1-6 cancelled Jan 5, 2026 in 20s

Failed

Integration test for component controller-rhel9-operator-1-6 snapshot scenario operator-enterprise-contract-1-6 has not run and is considered as failed because the build pipelinerun failed and snapshot was not created

Details

build pipelinerun orchestrator-releng-tenant/controller-rhel9-operator-on-pull-request-1-6-kr6fx failed, so that snapshot is not created. Please fix build pipelinerun failure and try again.