Skip to content

➕ kettle-dev v1.1.16 #2

➕ kettle-dev v1.1.16

➕ kettle-dev v1.1.16 #2

Triggered via pull request September 11, 2025 09:57
@pbolingpboling
synchronize #2
kettle-dev
Status Failure
Total duration 51s
Artifacts

dep-heads.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Specs jruby@dep-heads
Process completed with exit code 5.
Specs ruby@dep-heads
The operation was canceled.
Specs ruby@dep-heads
The strategy configuration was canceled because "test.jruby_dep-heads_rake_test" failed
Specs truffleruby@dep-heads
The operation was canceled.
Specs truffleruby@dep-heads
The strategy configuration was canceled because "test.jruby_dep-heads_rake_test" failed