β kettle-dev #11
Triggered via pull request
September 12, 2025 11:25
Status
Failure
Total duration
1m 51s
Artifacts
–
Annotations
5 errors
|
Specs jruby@current
Process completed with exit code 5.
|
|
Specs ruby@current
The operation was canceled.
|
|
Specs ruby@current
The strategy configuration was canceled because "test.jruby_current_rake_test_A" failed
|
|
Specs truffleruby@current
The operation was canceled.
|
|
Specs truffleruby@current
The strategy configuration was canceled because "test.jruby_current_rake_test_A" failed
|