Skip to content

Update scala-library to 2.12.21 #412

Update scala-library to 2.12.21

Update scala-library to 2.12.21 #412

Triggered via push December 12, 2025 15:14
Status Failure
Total duration 3m 42s
Artifacts

ci.yml

on: push
Matrix: Build and Test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Build and Test (ubuntu-latest, 2.11.12, temurin@17)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 3.7.4, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_t_2" failed
Build and Test (ubuntu-latest, 3.7.4, temurin@17)
The operation was canceled.
Build and Test (ubuntu-latest, 3.7.4, temurin@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_t_2" failed
Build and Test (ubuntu-latest, 3.7.4, temurin@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.18, temurin@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_t_2" failed
Build and Test (ubuntu-latest, 2.13.18, temurin@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.21, temurin@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_t_2" failed
Build and Test (ubuntu-latest, 2.12.21, temurin@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.21, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_t_2" failed
Build and Test (ubuntu-latest, 2.12.21, temurin@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.18, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_t_2" failed
Build and Test (ubuntu-latest, 2.13.18, temurin@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.11.12, temurin@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_t_2" failed
Build and Test (ubuntu-latest, 2.11.12, temurin@11)
The operation was canceled.