chore(deps-dev): bump ruff from 0.12.1 to 0.12.4 in /scaleway (#1089) #2358
checks.yml
on: push
Matrix: format
Matrix: linting
Matrix: tests
Matrix: typing
Annotations
3 errors
|
typing (scaleway-core)
Process completed with exit code 1.
|
|
typing (scaleway-async)
The strategy configuration was canceled because "typing.scaleway-core" failed
|
|
tests (scaleway)
Process completed with exit code 1.
|