Skip to content

chore(deps-dev): bump pyrefly from 0.24.2 to 0.26.1 in /scaleway-asyn… #2525

chore(deps-dev): bump pyrefly from 0.24.2 to 0.26.1 in /scaleway-asyn…

chore(deps-dev): bump pyrefly from 0.24.2 to 0.26.1 in /scaleway-asyn… #2525

Triggered via push August 8, 2025 15:03
Status Failure
Total duration 36s
Artifacts

checks.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
tests (scaleway, 3.13)
Process completed with exit code 1.
tests (scaleway, 3.11)
Process completed with exit code 1.
tests (scaleway, 3.11)
The strategy configuration was canceled because "tests.scaleway_3_13" failed
tests (scaleway, 3.12)
Process completed with exit code 1.
tests (scaleway, 3.12)
The strategy configuration was canceled because "tests.scaleway_3_13" failed
tests (scaleway, 3.10)
The operation was canceled.
tests (scaleway, 3.10)
The strategy configuration was canceled because "tests.scaleway_3_13" failed