Skip to content

feat(ipam): add support for filtering with scbl_sedb_cluster #2591

feat(ipam): add support for filtering with scbl_sedb_cluster

feat(ipam): add support for filtering with scbl_sedb_cluster #2591

Triggered via pull request August 20, 2025 12:28
Status Failure
Total duration 32s
Artifacts

checks.yml

on: pull_request
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

17 errors
tests (scaleway, 3.11)
Process completed with exit code 1.
tests (scaleway-core, 3.11)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-core, 3.10)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-core, 3.12)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-async, 3.11)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-async, 3.12)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-async, 3.13)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-core, 3.13)
The operation was canceled.
tests (scaleway-core, 3.13)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway, 3.12)
The operation was canceled.
tests (scaleway, 3.12)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway, 3.13)
The operation was canceled.
tests (scaleway, 3.13)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway, 3.10)
The operation was canceled.
tests (scaleway, 3.10)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-async, 3.10)
The operation was canceled.
tests (scaleway-async, 3.10)
The strategy configuration was canceled because "tests.scaleway_3_11" failed