Skip to content

chore(deps-dev): bump types-python-dateutil from 2.9.0.20250708 to 2.9.0.20250822 in /scaleway-core #2674

chore(deps-dev): bump types-python-dateutil from 2.9.0.20250708 to 2.9.0.20250822 in /scaleway-core

chore(deps-dev): bump types-python-dateutil from 2.9.0.20250708 to 2.9.0.20250822 in /scaleway-core #2674

Triggered via pull request September 2, 2025 01:55
Status Failure
Total duration 31s
Artifacts

checks.yml

on: pull_request
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

15 errors
tests (scaleway, 3.11)
Process completed with exit code 1.
tests (scaleway-async, 3.11)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway, 3.13)
Process completed with exit code 1.
tests (scaleway, 3.13)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-async, 3.12)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-core, 3.13)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway, 3.12)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway, 3.10)
Process completed with exit code 1.
tests (scaleway, 3.10)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-async, 3.10)
The operation was canceled.
tests (scaleway-async, 3.10)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-core, 3.12)
The operation was canceled.
tests (scaleway-core, 3.12)
The strategy configuration was canceled because "tests.scaleway_3_11" failed
tests (scaleway-core, 3.10)
The operation was canceled.
tests (scaleway-core, 3.10)
The strategy configuration was canceled because "tests.scaleway_3_11" failed