Skip to content

[v3.11.4] Fervo_Project_Cape-5: Multi-Year Construction Timeline and Reservoir Engineering updates; SAM-EM Payback Period; SAM-EM ITC #2669

[v3.11.4] Fervo_Project_Cape-5: Multi-Year Construction Timeline and Reservoir Engineering updates; SAM-EM Payback Period; SAM-EM ITC

[v3.11.4] Fervo_Project_Cape-5: Multi-Year Construction Timeline and Reservoir Engineering updates; SAM-EM Payback Period; SAM-EM ITC #2669

Triggered via pull request January 16, 2026 16:56
Status Failure
Total duration 19m 14s
Artifacts

github-actions.yml

on: pull_request
Matrix: test
Upload coverage to Coveralls
0s
Upload coverage to Coveralls
Deploy docs to GitHub Pages
0s
Deploy docs to GitHub Pages
Fit to window
Zoom out
Zoom in

Annotations

13 errors
py38 (ubuntu)
Process completed with exit code 1.
py310 (ubuntu)
The strategy configuration was canceled because "test.py38__ubuntu__3_8_python3" failed
py310 (ubuntu)
The operation was canceled.
py311 (ubuntu)
The strategy configuration was canceled because "test.py38__ubuntu__3_8_python3" failed
py311 (ubuntu)
The operation was canceled.
py39 (ubuntu)
The strategy configuration was canceled because "test.py38__ubuntu__3_8_python3" failed
py39 (ubuntu)
The operation was canceled.
py312 (ubuntu)
The strategy configuration was canceled because "test.py38__ubuntu__3_8_python3" failed
py312 (ubuntu)
The operation was canceled.
py311 (windows)
The strategy configuration was canceled because "test.py38__ubuntu__3_8_python3" failed
py311 (windows)
The operation was canceled.
py311 (macos)
The strategy configuration was canceled because "test.py38__ubuntu__3_8_python3" failed
py311 (macos)
The operation was canceled.