forked from NREL/GEOPHIRES-X
-
Notifications
You must be signed in to change notification settings - Fork 1
Fervo_Project_Cape-5: Multi-Year Construction Timeline and Reservoir Engineering updates
#117
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
Open
softwareengineerprogrammer
wants to merge
266
commits into
main
Choose a base branch
from
project-cape-mcy-and-res-eng-updates-2
base: main
Could not load branches
Branch not found: {{ refName }}
Loading
Could not load tags
Nothing to show
Loading
Are you sure you want to change the base?
Some commits from the old base branch may be removed from the timeline,
and old review comments may become outdated.
Open
Fervo_Project_Cape-5: Multi-Year Construction Timeline and Reservoir Engineering updates
#117
softwareengineerprogrammer
wants to merge
266
commits into
main
from
project-cape-mcy-and-res-eng-updates-2
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
17 tasks
…ulated Well (no effect on economic result metrics)
…tivity testing inconvenient)
…ns to validate that build passes with new version pivot (this commit should be reverted soon after merging)
…s-new-version FPC updates as new `Fervo_Project_Cape-5` version
…ub Actions to validate that build passes with new version pivot (this commit should be reverted soon after merging)" This reverts commit 923672e.
…ction capex schedule based on SME feedback (WIP: full sensitivity analysis regen, recalibrate Fervo_Project_Cape-6, etc.)
…on, lower fracture height, 1 kg/s higher flow rate, higher PI/II, drawdown tuned for 3 redrillings instead of 2 (WIP to calibrate parasitic load with external source, it might be a little low now). also match docs calibration scenario better with singh et al. scenario (also WIP)
…ominally align with the fact that the fracture is at least slightly wider than spacing
…s discussion of limitations (https://samrepo.nrelcloud.org/help/mtf_payback.html)
…e-mcy-and-res-eng-updates-2
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Description
Web interface links:
Fervo_Project_Cape-5(Phase II): https://gtp.scientificwebservices.com/geophires/?shared-geophires-result-id=891748dd-932b-4b04-9f70-5a1f0deaea63Fervo_Project_Cape-6(Phase I): https://gtp.scientificwebservices.com/geophires/?shared-geophires-result-id=0b78909a-abcb-4187-9318-90cf72d5a6fdTODO
Fervo_Project_Cape-4based on publicly stated timelines - https://fervoenergy.com/fervo-energy-raises-462-million-series-e-to-accelerate-geothermal-development-and-meet-surging-energy-demand-with-clean-firm-power/Fervo_Project_Cape-4Fervo_Project_Cape-5: 71607b7Number of Fractures per Stimulated WellTesting & Verification
Change Checklist:
Observe the following checklist items if your change includes a new version (see versioning notes and version management docs).
Before merging:
After merging:
git push origin refs/tags/vM.m.P