Description

Fervo 500 MWe Update

Addresses NREL#385

Capacity increase achieved by:

  1. Increasing flow rate to 107 kg/s per production well
  2. Increasing number of doublets to 54

Input Assumptions

Screenshot of Fervo_Project_Cape-4.md which is added to Reference manual:

Screenshot 2025-05-29 at 08 57 09

Results Comparison with References & Requirements

Screenshot of Fervo_Project_Cape-4.md:

Screenshot 2025-05-29 at 08 57 17

TODO

  1. Is Reservoir impedance = 0.001 GPa.s/m³ appropriate? (Assuming yes since it's the value we used for the 400 MWe case)
  2. Per Fervo's announcement of "optimizing well spacing using fiber optic sensing", we should probably update Well Separation, whose current value is 365 feet. I don't know what an appropriate value would be here. (Note: the case is not sensitive to the Well Separation parameter so this value is currently just for display - arguably we should maybe even remove it.)

50 MWe SAM Example

Pivots SAM example (example_SAM-single-owner-PPA) from Fervo 400 MWe to 50 MWe to avoid redundancy/confusion with existing Fervo 400 MWe BICYCLE example (Fervo_Project_Cape-3) and Fervo 500 MWe SAM case study (Fervo_Project_Cape-4)

https://gtp.scientificwebservices.com/geophires/?geophires-example-id=example_SAM-single-owner-PPA

Testing & Verification

Fervo 500 MWe Update

https://gtp.scientificwebservices.com/geophires/?shared-geophires-result-id=466f43fc-7728-469c-a115-7612c9935e04

@softwareengineerprogrammer softwareengineerprogrammer changed the title Fervo Cape Station 500 MWe Update Fervo Cape Station 500 MWe Update + 50 MWe SAM Example May 21, 2025
… to distinguish from BICYCLE model's substraction of ITC from 'Total capital costs'.
…bly display capex for all econ models but decided to limit scope for now)
…date to NREL link once merged into main repo)
@softwareengineerprogrammer softwareengineerprogrammer merged commit cbdc94b into main May 30, 2025
24 checks passed
@softwareengineerprogrammer softwareengineerprogrammer deleted the fervo-cape-station-500-mwe-2 branch June 18, 2025 20:45
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

1 participant