Fervo_Project_Cape-4 multilaterals #80
Closed
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Number of Multilaterals
to zero with comment: "This parameter is set to 0 because, for this case study, the cost of horizontal drilling (which would otherwise account for approximately 118 multilateral sections) is included within the 'vertical drilling cost.' This approach allows us to more directly convey the overall well drilling and completion cost, which is under $4 million." https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/80/files#diff-4c74f5cca6c379d27c945d138d703e4ef20d0abb1cd07282659e5b336e45ce2dR79Number of Multilateral Sections
: https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/80/files#diff-3d85ef79807fc6c25a758a698fd3a7095750bd27ea52341700e1dad94885b5f6R950Drilling and completion costs per well
: https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/80/files#diff-297987ad3d14c84ee6385298fa35b4691491b3cf35c15c45c23a1ea23b01c3ccR336