Nightly package repository sync #452
package-sync-nightly.yml
on: schedule
Build package matrix of package repo sync jobs
7s
Matrix: Sync
Annotations
2 errors and 4 warnings
Sync (rocky_9_aarch64) / Sync package repositories in Ark
The job running on runner arc-release-train-runner-848s7-runner-lwg6p has exceeded the maximum execution time of 480 minutes.
|
Sync (rocky_9_aarch64) / Sync package repositories in Ark
The operation was canceled.
|
Sync (third_party) / Sync package repositories in Ark
Attempt 1 failed. Reason: Child_process exited with error code 2
|
Sync (rocky_9) / Sync package repositories in Ark
Attempt 1 failed. Reason: Child_process exited with error code 2
|
Sync (rocky_9_aarch64) / Sync package repositories in Ark
Attempt 1 failed. Reason: Timeout of 21600000ms hit
|
Sync (ubuntu_focal) / Sync package repositories in Ark
Attempt 1 failed. Reason: Child_process exited with error code 2
|