Skip to content

Proposed rework of conformances #256

Proposed rework of conformances

Proposed rework of conformances #256

Triggered via pull request April 17, 2025 22:59
Status Failure
Total duration 33s
Artifacts

ci.yaml

on: pull_request
Matrix: Continuous integration
Deploy docs
0s
Deploy docs
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Continuous integration (3.11)
Process completed with exit code 1.
Continuous integration (3.12)
The operation was canceled.
Continuous integration (3.12)
The strategy configuration was canceled because "ci._3_11" failed
Continuous integration (3.13)
The operation was canceled.
Continuous integration (3.13)
The strategy configuration was canceled because "ci._3_11" failed