chore(deps): bump the dependencies group across 1 directory with 24 updates #5952
testing.yml
on: pull_request
Matrix: Lint
Matrix: Proselint
Matrix: E2E test and link check
Matrix: Unit Test
Annotations
2 errors
Proselint (ubuntu-latest)
Vale and reviewdog exited with status code: 2
|
E2E test and link check (ubuntu-latest, lts/*)
The process '/usr/local/bin/yarn' failed with exit code 1
|