Skip to content

Topic workload SLO #1843

Topic workload SLO

Topic workload SLO #1843

Triggered via pull request September 15, 2025 10:53
@vgvolegvgvoleg
synchronize #703
topic_slo
Status Cancelled
Total duration 13m 52s
Artifacts

tests.yaml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

18 errors
build (3.8, py-proto3, ydb)
Event loop is closed
build (3.8, py-proto4, ydb)
Event loop is closed
build (3.9, py-proto4, ydb)
Event loop is closed
build (3.9, py, ydb)
Event loop is closed
build (3.9, py-proto3, ydb)
Event loop is closed
build (3.8, py, ydb)
Event loop is closed
build (3.8, py, tests)
The operation was canceled.
build (3.8, py, tests)
Canceling since a higher priority waiting request for unit-refs/pull/703/merge-py-3.8-tests exists
build (3.9, py-proto4, tests)
The operation was canceled.
build (3.9, py-proto4, tests)
Canceling since a higher priority waiting request for unit-refs/pull/703/merge-py-proto4-3.9-tests exists
build (3.8, py-proto3, tests)
The operation was canceled.
build (3.8, py-proto3, tests)
Canceling since a higher priority waiting request for unit-refs/pull/703/merge-py-proto3-3.8-tests exists
build (3.8, py-proto4, tests)
The operation was canceled.
build (3.8, py-proto4, tests)
Canceling since a higher priority waiting request for unit-refs/pull/703/merge-py-proto4-3.8-tests exists
build (3.9, py-proto3, tests)
The operation was canceled.
build (3.9, py-proto3, tests)
Canceling since a higher priority waiting request for unit-refs/pull/703/merge-py-proto3-3.9-tests exists
build (3.9, py, tests)
The operation was canceled.
build (3.9, py, tests)
Canceling since a higher priority waiting request for unit-refs/pull/703/merge-py-3.9-tests exists