Skip to content

Conversation

@lcawl
Copy link
Contributor

@lcawl lcawl commented May 9, 2025

Backport

This will backport the following commits from main to 9.0:

Questions ?

Please refer to the Backport tool documentation

@lcawl lcawl requested a review from kibanamachine as a code owner May 9, 2025 21:32
@lcawl lcawl added the backport This PR is a backport of another PR label May 9, 2025
@lcawl lcawl enabled auto-merge (squash) May 9, 2025 21:32
@lcawl lcawl requested a review from a team May 9, 2025 21:36
Copy link
Contributor

@florent-leborgne florent-leborgne left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

👍

@lcawl lcawl merged commit d57c649 into elastic:9.0 May 21, 2025
9 checks passed
@elasticmachine
Copy link
Contributor

💛 Build succeeded, but was flaky

Failed CI Steps

Test Failures

  • [job] [logs] Jest Tests #13 / Description renders description correctly

Metrics [docs]

Async chunks

Total size of all lazy-loaded chunks that will be downloaded as the user navigates the app

id before after diff
aiAssistantManagementSelection 106.8KB 107.5KB +752.0B
lists 150.7KB 151.4KB +752.0B
uptime 404.0KB 404.0KB -32.0B
total +1.4KB

Page load bundle

Size of the bundles that are downloaded on every page load. Target size is below 100kb

id before after diff
core 433.6KB 434.4KB +752.0B

History

@lcawl lcawl deleted the backport/9.0/pr-219310 branch May 22, 2025 01:59
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants