Skip to content

zh,en: add feature gates doc (#3026)#3029

Merged
ti-chi-bot[bot] merged 10 commits intopingcap:release-2.0from
ti-chi-bot:cherry-pick-3026-to-release-2.0
Dec 3, 2025
Merged

zh,en: add feature gates doc (#3026)#3029
ti-chi-bot[bot] merged 10 commits intopingcap:release-2.0from
ti-chi-bot:cherry-pick-3026-to-release-2.0

Conversation

@ti-chi-bot
Copy link
Copy Markdown
Member

This is an automated cherry-pick of #3026

First-time contributors' checklist

What is changed, added, or deleted? (Required)

Which TiDB Operator version(s) do your changes apply to? (Required)

  • main (the latest development version for v2.x)
  • v2.0 (TiDB Operator 2.0 versions)
  • release-1.x (the latest development version for v1.x)
  • v1.6 (TiDB Operator 1.6 versions)
  • v1.5 (TiDB Operator 1.5 versions)
  • v1.4 (TiDB Operator 1.4 versions)
  • v1.3 (TiDB Operator 1.3 versions)

What is the related PR or file link(s)?

  • This PR is translated from:
  • Other reference link(s):

liubog2008 and others added 10 commits December 3, 2025 03:15
Signed-off-by: liubo02 <liubo02@pingcap.com>
Co-authored-by: Hoshea <fgksgf@gmail.com>
Signed-off-by: liubo02 <liubo02@pingcap.com>
Co-authored-by: Aolin <aolinz@outlook.com>
Co-authored-by: Aolin <aolinz@outlook.com>
Co-authored-by: Aolin <aolinz@outlook.com>
@ti-chi-bot ti-chi-bot added lgtm size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-2.0 This PR is cherry-picked to release-2.0 from a source PR. v2.0 This PR/issue applies to TiDB Operator v2.0. labels Dec 3, 2025
@ti-chi-bot ti-chi-bot mentioned this pull request Dec 3, 2025
8 tasks
@Oreoxmt
Copy link
Copy Markdown
Collaborator

Oreoxmt commented Dec 3, 2025

/approve

@ti-chi-bot
Copy link
Copy Markdown

ti-chi-bot bot commented Dec 3, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: Oreoxmt

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@ti-chi-bot ti-chi-bot bot added the approved label Dec 3, 2025
@ti-chi-bot ti-chi-bot bot merged commit b2df4c2 into pingcap:release-2.0 Dec 3, 2025
14 checks passed
@ti-chi-bot ti-chi-bot bot deleted the cherry-pick-3026-to-release-2.0 branch December 3, 2025 03:37
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved lgtm size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-2.0 This PR is cherry-picked to release-2.0 from a source PR. v2.0 This PR/issue applies to TiDB Operator v2.0.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants