Skip to content

fix: Accept nil serializer #2

fix: Accept nil serializer

fix: Accept nil serializer #2

Re-run triggered May 31, 2025 15:58
Status Failure
Total duration 45s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (3.4.4)
Process completed with exit code 1.
test (3.1.7)
The operation was canceled.
test (3.1.7)
The strategy configuration was canceled because "test._3_4_4" failed
test (3.2.8)
The operation was canceled.
test (3.2.8)
The strategy configuration was canceled because "test._3_4_4" failed
danger
Process completed with exit code 1.
test (3.3.8)
The operation was canceled.
test (3.3.8)
The strategy configuration was canceled because "test._3_4_4" failed